Retrieving RFP details
Release
Close
Borough of Chambersburg
Work includes 4,226 SY of 10" full depth reclamation with portland cement; 507 TN of superpave 12.5mm PG64-22 wearing course 0.0 to 0.3 million ESAL SRL-M 2" depth hot mix asphalt overlay prime coat incidental, tack coat entire roadway before wearing course is applied; 254 TN of supply and place superpave 19mm PG 64 22 leveling course 0.0 to 0.3 million ESAL SRL-M as needed; 1,409 SY of sub base repair of un-suitable materials 2A aggregate at 12" depth; replacement of manhole cover/ riser; 8,025 SF of sidewalk removal and installation; 1,605 LF of curb installation; 162 SF of additional grading and associated works.
Final Bid Packet - Full Depth Reclamation of Pleasant Street and Curb Sidewalk Installation along Pleasant Street from Franklin Street to Elder St~
California Department of Transportation
Full depth recycling, cold plane, HMA and curb ramps.
Trenton Area Soup Kitchen (TASK)
To perform concrete installation work at our facility. The scope of work includes: Drawings and Permits Removal of 4 inches of existing soil between the sidewalk and curb Replacement with 4" of concrete and appropriate expansion joints Interested parties must be licensed and insured.
West Lampeter Township
The principal items of work to be performed under the contract are: 1) site demolition; 2) full-depth pavement removal; 3) full-depth pavement shoulder widening; 4) installation of concrete curb and sidewalk; 5) installation of ADA curb ramps; 6) modification to existing stormwater collection and conveyance system; 7) installation of new stormwater collection and conveyance system; 8) driveway pavement restoration; 9) site grading, topsoil and seeding; 10) pavement markings and signage; and 11) work of similar nature.
Release
Oct 01, 2025
Close
Nov 10, 2025