South Carolina Department of Transportation
Perform full depth asphalt patching. The contractor shall mill the existing roadway 8" full depth and place hot mix asphalt, to include all dressing, cleanup, and disposal of materials.
bulk
zip
Release
Aug 16, 2024
Close
Sep 17, 2024