Framingham State University
Disconnection, cutting, capping, and safe termination of existing utilities located beneath the first-floor concrete slab or passing through it to the basement below. It also involves temporary shoring of the existing perimeter foundation walls to facilitate the complete demolition of the first-floor slab, as shown in the project drawings. Following demolition, a new concrete slab will be installed, and the previously removed building systems will be reconnected or reinstalled to accommodate the new slab with epoxy coating.
Release
May 21, 2025
Close
Jul 10, 2025