Retrieving RFP details
Release
Close
City of Elizabethtown
To regrade an existing drainage ditch and install approx. 250 LF of storm sewer pipe and associated storm sewer structures including sidewalk, roadway and driveway replacement for any disturbed surfaces.
City of Covington
Professional construction manager at risk (CMR) services; covington central riverfront (CCR) development infrastructure phase ii.
City of Raleigh
Provide engineering services and preparation of contract documents in advance of construction for phase ii of the downtown pedestrian safety improvement project.
Town of Southbridge
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
Release
Oct 17, 2025
Close
Nov 05, 2025