Travis Unified School District
Removal and disposal of existing siding, skirting, facia trim, and corner trim on eight portables. Sides to be marked by the District prior to construction start; Any dry rot or damaged areas behind the siding shall be repaired (Approved by the District) on a T&M basis; Perform a visual inspection of old insulation. Remove and replace damaged insulation with new Tyvek insulation on a T&M basis. (Approval by the District)
Foxboro Elementary Portable Siding Replacement Project
zip
Release
Apr 25, 2025
Close
May 13, 2025