Retrieving RFP details
Release
Close
National Guard Bureau (NGB)
Procuring a one-time repair of the creek fish barrier streambank. The contract shall include (but not be limited to) the repair or installation of rock, geotextile, mulch, and vegetation as well as the clearing, removal, and disposal of existing trees, limbs, logs and stumps within the designated recovery area.
For Hampton Creek Fish Barrier Replacement; TWRA
zip
California Department of Motor Vehicles
Perform asbestos floor remediation, moisture barrier installation, flooring replacement, and cove base replacement.
Yakama Nation Fisheries
Survey approx 180 miles along Toppenish and Satus Creek within the Yakama Nation Reservation. Use data collected from field survey to create a database and prioritization tool of identified fish passage barriers.
Indiana Department of Administration
Potato creek state park culvert replacement project and not exceed 9mb.
Maryland State Highway Administration
Work consists of traffic barrier upgrades, replacements and new installations of traffic barrier to meet mash compliance.
Release
Oct 13, 2025
Close
Oct 31, 2025