Retrieving RFP details
Release
Close
City of Sioux City
Floyd plc lift station upgrade/ scada interface.
City of Jefferson City
Provide SCADA and PLC programming, maintenance and upgrade services. There are approximately thirty (30) SCADA remote locations and forty (40) PLCs. Corrective maintenance and repairs: Troubleshooting: Diagnosing and resolving issues within the SCADA and PLC systems. Wiring and hardware repair: Repairing or replacing worn-out wiring, broken standoffs, and other damaged hardware. See attached files.
Town of Wellfleet
Project consists of wellfleet transfer station upgrade. See outside link.
City of Hallandale Beach
Work includes to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system, rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, scada, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project.
Release
Oct 31, 2025
Close
Nov 12, 2025