Retrieving RFP details
Release
Close
City of Bentonville
Work includes replacement of rigid tapered insulation; replacement of damaged steel decking; replacement of plywood sheathing on back side of parapet; replacement of 2x wood blocking atop parapet.
Fire Station 1 Re-roof Project
zip
Barstow Fire Protection District
Remove and replace 10,700 SF roof over the existing roof structure.
Des Moines Public School District
Work includes gymnasium re-roof project
Memphis Light, Gas and Water Division (MLGW)
Replace the existing roof on the aerator building including the installation of a roof hatch and ladder to access the roof at the pumping station.
Release
Oct 13, 2025
Close
Nov 04, 2025