City of Worcester
Replace each existing obsolete panel component with new that are ul listed and compatible with existing devices and equipment. Work includes replace nodes one, two, three, and four; complete all low voltage terminations within nodes one, two, three, and four; reuse all existing fire alarm control panel enclosures; reuse all existing fire alarm infrastructure included but not limited to fire alarm cabling, field devices and remote power supplies; furnish one (1) single-bay enclosure for node 4; provide a daily rate to be on-site to assist electrical contractor with troubleshooting if required after panel components are replaced. See attached file.
Fire Alarm Repairs - DCU Center / DPF *Sole Source*
zip
Release
Mar 19, 2025
Close
Apr 02, 2025