Faulkner University
Work includes 100 CY measured in place (CYMIP) of removal and off-site disposal of unsuitable soil and furnishing, placing and compacting of acceptable fill material from below the finished subgrade and tested to meet requirements specified for the affected area, 50 CY measured in place (CYMIP) for excavation of unsuitable soils, disposal off site of excavated material and furnishing and installation of lean concrete mud footing "mud sill"; see outside link.
Release
Sep 05, 2024
Close
Sep 12, 2024