Retrieving RFP details
Release
Close
Kentucky Transportation Cabinet
2,283 TN, DGA base; 327.60 TN, asphalt seal aggregate; 40.20 TN, asphalt seal coat; 15.60 CY, remove concrete masonry; 5 TN channel lining class II; 4 EA, portable changeable message sign; 448 EA, delineator for guardrail bi directional white; 22,160 LF, guardrail-steel W beam-S face; 21 EA, guardrail terminal section no 1; 27 EA, guardrail end treatment type 1; 20,245 LF, remove guardrail; 132 LF, guardrail-bridge case II; 8 EA, thrie beam guardrail transition TL-3. See attached files.
KY 1 @ East Carter High School Intersection
zip
Kentucky Transportation Cabinet
Work consists of 1,921.00 TN, DGA vase; 10.40 TN, crushed stone base; 42.80 TN, crushed aggregate size no 2; 277.33 TN, asphalt seal aggregate; 33.36 TN, asphalt seal coat; 5 TN, channel lining class II; 161 CY, fabric-geotextile class 2; 435 SF, cribbing; 453 EA, delineator for guardrail bi directional white; 22,123 LF, guardrail-steel W beam-S face; 5 EA, guardrail terminal section no 1; 17 EA, guardrail end treatment type 1; 20,575 LF, remove guardrail; 28 EA, extra length guardrail post; 10 EA, thrie beam guardrail transition TL-3. See attached files.
Michigan Department of Technology, Management and Budget
Bridge rehabilitation including epoxy overlay and joint resealing on I-94 over US-127 and over the Jackson and Lansing RR and Grand River, Jackson County. includes 2,355 FT pavement marking overlay cold plastic 6" shadow tape black, 12,675 FT pavement marking wet reflective polyureu 6" white, 5 EA sign cover, 1,944 FT temp rumble strips (orange) advance of a work zone.
Cleveland State University
Project involves the interior renovation of classroom 127 and128 and the corridor immediately outside of the classroom. Work includes the removal of concrete tiers to support the desired layout and use of the classroom space. New technology includes pc's at each seat, wall mounted monitors and a ticker in the corridor are proposed. New finishes including flooring, wallcovering, paint, laminate panels and ceiling are proposed. New lighting, HVAC diffusers and controls are proposed and other work.
Release
Oct 30, 2025
Close
Nov 20, 2025