School Construction Authority
Work includes repoint areas of masonry brick; machine tool clean, prime, and repaint minor deteriorated steel window lintels; remove, clean, and reinstall existing roof drain cover; remove and replace areas of existing exterior brick masonry where damaged; clean existing masonry brick at areas of visible efflorescence; remove and replace areas of plaster that have been damaged and paint; provide new stone parapet coping at specified locations; provide new metal flashing with drip edge on each side of stone parapet. See attached files.
25-21612D-1
zip
Release
Aug 26, 2024
Close
Sep 12, 2024