Logo

starbridge

Book a Demo
RFPs/Erosion Control Improvements At Moanalua Road Near Pearlridge Elementary School (IFB)

Erosion Control Improvements At Moanalua Road Near Pearlridge Elementary School (IFB)

City And County Of Honolulu

Summary

Work includes 1,333 SY of clearing and vegetation removal; 5 EA of shower tree removal; 300 CY of removal of sediment and debris at concrete ditches along benches; 115 CY of removal of sediment and debris behind hdpe silt screen and chain link fence; 1 LS of earthwork; 400 SY of geosynthetic cementitious composite mat; 550 SY of composite turf reinforcement mat; 50 CY of grouted riprap; 550 SY of 4" topsoil; 550 SY of grass hydro-mulch seeding, including 60 day maintenance period and temporary irrigation; 709 LF of removal and replacement of chain link fence; 2 EA of removal and replacement of pedestrian gate; 1 LS of demolition and reconstruction of existing concrete cut-off ditches (assumes 50% of exposed ditches required for repair); 1 LS of mobilization.

Files

Erosion Control Improvements At Moanalua Road Near Pearlridge Elementary School (IFB)

zip

Details

Release

Mar 07, 2025

Close

Mar 31, 2025

Contacts

Source