Summary
Work for the emergency room doorway. The contractor shall furnish all materials, equipment, supervision, and personnel necessary to
accomplish the project as indicated. Remove existing door and doorway material. Supply and install new hollow metal door frame and door. Supply and install stucco and wire mesh. Address the stone walkway area directly infront of doorway. Infection control and safety measures shall be provided per the contract specifications throughout the construction period to minimize risks. All work shall be completed in accordance with the latest ANSI, VA, UFAS, local, state and federal regulations. See attached file.