Logo

starbridge

Book a Demo
RFPs/Elevator Repair, Replacement and Upgrades - Centennial Hall Elevator Replacements

Elevator Repair, Replacement and Upgrades - Centennial Hall Elevator Replacements

Lander University

Summary

Lander University is seeking proposals for Design-Bid-Build construction services for the Elevator Repair, Replacement, and Upgrades project at Centennial Hall. The project involves the removal of two existing elevator systems, installation of two new systems, modernization of the elevator cabs, and upgrades to the supporting mechanical and electrical infrastructure to ensure code compliance. The estimated construction cost range is $550,000 to $700,000. Bids are due by 3:00 PM on September 10, 2024. A 5% bid security is required, and the successful contractor must provide performance and payment bonds equal to 100% of the contract price. The pre-bid conference is scheduled for August 27, 2024, at 10:00 AM.

Files

SE-310 H21-9552-CL

pdf

Details

Release

Sep 10, 2024

Close

Sep 10, 2024

Contacts

Source

Get a Free RFP Download