Lander University
Lander University is seeking proposals for Design-Bid-Build construction services for the Elevator Repair, Replacement, and Upgrades project at Centennial Hall. The project involves the removal of two existing elevator systems, installation of two new systems, modernization of the elevator cabs, and upgrades to the supporting mechanical and electrical infrastructure to ensure code compliance. The estimated construction cost range is $550,000 to $700,000. Bids are due by 3:00 PM on September 10, 2024. A 5% bid security is required, and the successful contractor must provide performance and payment bonds equal to 100% of the contract price. The pre-bid conference is scheduled for August 27, 2024, at 10:00 AM.
SE-310 H21-9552-CL
Release
Sep 10, 2024
Close
Sep 10, 2024