Strasburg Sanitation And Water District
WORK to be performed generally includes the overall rehabilitation of an existing 75,000 gallon double ellipsoidal multi-leg steel tank, including but not limited to: design, fabrication/furnishing, and installation of the following upgrades: new shell-to-roof ladder, leg ladder extension, fall arrest system, new hatch guardrail, and new catwalk guardrail; replacement of vent and overflow piping; replacement of frost jacket and associated insulation; interior and exterior surface preparation; full-containment blasting using additive for heavy metal abatement; painting; disposal of spent abrasive; and tank disinfection.
City of Breese
Project includes the following work: installation of a new 300,000 - Gallon single pedestal elevated water storage tank.
City of Meigs
Construct the proposed 200,000 gallon elevated water storage tank. In general, construction consists of a multi-column elevated water storage tank, foundation, water main, fire hydrant, fencing, electrical, FAA obstruction lighting and all other associated appurtenances necessary for a complete installation.
City of Muskegon Heights
Getty elevated storage tank.