Retrieving RFP details
Release
Close
City and County of Honolulu
Installing level 2 electric vehicle chargers at three (3) sites.
Electric Vehicle Charging Stations at Various City Facilities on Oahu, Hawaii
zip
NJ Division of Property Management & Construction
Electric vehicle charging stations.
Maryland Department of General Services
Electric vehicle charging stations.
City of Newnan
Purchase, delivery, and installation of three (3) electric vehicle (EV) charging stations. Equipment Specifications. • Charging stations must be new, UL-certified, and compliant with SAE J1772 (Level 2), CCS, and/or CHAdeMO standards (for DC fast charging). • Must support Open Charge Point Protocol (OCPP 1.6 or higher) to ensure network. interoperability. • Networking must allow for usage monitoring, reporting, and remote troubleshooting. • Equipment must meet ADA accessibility requirements. Installation Requirements: • The contractor is responsible for all site preparation, trenching, conduit installation, electrical upgrades, concrete pads, signage, and striping as required. • All work must comply with the National Electrical Code (NEC), local building codes, and permitting requirements. • The contractor must coordinate with the local utility provider for power connection and upgrades if required. • Contractor must ensure ADA-compliant site layout.
Release
Oct 27, 2025
Close
Nov 19, 2025