Summary
Providing East T-Hangar Roof Rehabilitation (Hangar 1) (“Work”) at the Airport. The successful respondent will be expected to perform the following Work: Clean, patch, and tighten loose and replace missing fasteners of the existing metal roof. Remove and replace roof panels with interior spray foam insulation applied (one unit
indicated on Project Location Map) or patch roof panels and apply exterior spray polyurethane foam (DC315 by PPG Coatings or approved equal). Furnish and install a metal roofing acrylic/urethane restoration system over approx. 17,400 SF. Restoration system shall carry a minimum 15-year manufacturer’s warranty covering the
complete acrylic and polyurethane coating system.