Retrieving RFP details
Release
Close
East Bernstadt Independent School District
Construct a 3,500 SF (Base Bid) addition to the existing Elementary School Gymnasium to replace the outdoor courtyard area adjacent to the existing Administration office to create a new entry Lobby with a single standard elementary classroom space, a small office space, (2) Resource Rooms, and a custodial closet / storage space. Exterior walls shall be load-bearing masonry wall construction with brick veneer and cast stone / limestone accents to match the existing building construction. In addition to the load bearing masonry there are also supplemental structural columns and beams to support the roof structure. The interior walls and finishes include painted smooth-face CMU with acoustical ceiling tiles and a combination of floor finishes including porcelain tile in the corridors and solid vinyl tile in the instructional spaces. The roof system is a single-ply, fully adhered TPO membrane roofing system over a protection board, polyisocyanurate insulation, and metal decking on steel bar joints and a portion over structural metal deck supported by columns and beams. The HVAC system will be a primary fan coil unit with roof top energy recovery unit and ceiling mounted cassette units with supplement mini-split A/C units. Minimal site work includes demolition of the existing courtyard area and adjacent side walks to allow for the new addition and new side walks / front concrete patio area along the new addition to serve multiple building access points.
Southwest Dubois County School Corporation
Elementary school addition and renovation.
Midwest City-Del City School District
Provide elementary school addition & renovation.
Plano Independent School District
Provide construction manager at risk one step process for addition & renovation of kitchen renovation scope will include the following. Complete renovation of the existing kitchen, which will include the demolition of walls, ceiling, floor, and underground plumbing in the kitchen area only, installation of new underground plumbing, new concrete kitchen floor and tile, new walls and ceiling and finishes in kitchen, all new kitchen equipment , lights, hood assemblies, mechanical systems and new building addition for the new cooler and freezer assembly, new grease interceptor and new sanitary line. Main building work will include the removal of existing toilet partitions and installation on new partitions. Complete mechanical system controls replacement. New digital marquee.
Release
Oct 24, 2025
Close
Nov 12, 2025