Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Maplewood
Furnishing and installing a new wet sprinkler system inclusive of all piping with either upright or horizontal sidewall sprinkler heads as described in the specifications.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Nashoba Regional School District
Project includes but not limited to remove and replace the dry pipe feed main and loop main; replace approximately 115 linear feet of 4" dry-pipe main extending from the sprinkler riser; replace the existing air compressor and pressure regulation assembly with a new unit of equivalent or greater capacity. See attached file.
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
Nashoba Regional School District
Close: Dec 5, 2025
Project includes but not limited to remove and replace the dry pipe feed main and loop main; replace approximately 115 linear feet of 4" dry-pipe main extending from the sprinkler riser; replace the existing air compressor and pressure regulation assembly with a new unit of equivalent or greater capacity. See attached file.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fort Pierce Utilities Authority
professional contractors for a “Turnkey” replacement of the existing fire sprinkler and the installation of a new Fire Sprinkler System.
Posted Date
Oct 10, 2025
Due Date
Dec 11, 2025
Release: Oct 10, 2025
Fort Pierce Utilities Authority
Close: Dec 11, 2025
professional contractors for a “Turnkey” replacement of the existing fire sprinkler and the installation of a new Fire Sprinkler System.
AvailableTexas Health and Human Services Commission
Installation of a new automatic transfer switch. The Contractor shall complete the removal of the existing 600-amp automatic transfer switch (ATS) that is out of services and connect a new 600-amp ATS.
Posted Date
Nov 17, 2025
Due Date
Dec 3, 2025
Release: Nov 17, 2025
Texas Health and Human Services Commission
Close: Dec 3, 2025
Installation of a new automatic transfer switch. The Contractor shall complete the removal of the existing 600-amp automatic transfer switch (ATS) that is out of services and connect a new 600-amp ATS.
AvailableCity of Memphis
Fire sprinkler system maintenance.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
City of Memphis
Close: Dec 17, 2025
Fire sprinkler system maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →