Retrieving RFP details
Release
Close
Walton County
Work includes 9,600 LF sediment barrier, staked silt fence; 37 EA inlet protection system; 11,000 SY roadway pavement to be removed; 1,650 SY concrete driveways and sidewalks to be removed; 2,600 LF utility pipe,remove & dispose, 5-7.9"; 2,800 SY 4" thick conc sidewalk per fdot index 522-001; 1,900 SY restore existing driveways - match existing (concrete, asphalt or pavers); 902 SF detectable warnings; 6,640 LF type f (modified) curb and gutter, concrete; 59 LF valley gutter, concrete; 54 ton proposed roadway pavement - superpave asphaltic concrete, traffic b; 5,306 SY 8" crushed limerock, crushed conc, or gab mat, compacted. See outside link.
Driftwood Road and Ellis Road Roadway Improvements
zip
City of Brownsville
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
City of Columbus
Project includes replacement of existing roadway pavement, curbs, sidewalks, curb ramps, and pavement markings. The project also includes relocation of an existing waterline and replacement of existing roadway pavement, curbs, sidewalks, curb ramps, pavement markings, signage, and other such work.sidewalks.
City of Columbus
Work includes installing a single lane roundabout at the intersection, and a shared use path (sup) along the north side of renner road. Improvements also include the addition of an eastbound right turn lane and replacement of the traffic signal at the intersection of renner road and rentra drive, sidewalk on the north side of trabue road, lighting improvements, and pavement resurfacing.
Release
Sep 18, 2025
Close
Nov 10, 2025