Retrieving RFP details
Release
Close
City of Wichita
Work includes 362 cy fill, loose; 13283 cy excavation; 30700 sy pavement removed; 23403 sy ac pavement 7" (5" bit base); 1122 sy concrete pavement 7" (reinf); 5827 sy concrete pavement (vg) 8" (reinf); 5162 sy crushed rock base 7", reinforced; 29299 sy crushed rock base 8", reinforced; 3018 lf concrete curb, mono edge (6" & 1-1/2"); 8328 lf concrete c & g, type 1 (6" & 1-1/2"); 593 lf concrete c & g, type 3 (special); 100 ea wheelchair ramp w/ detectable warnings; 60078 sf concrete sidewalk 4"; 55106 sf concrete driveway 8" (reinforced); 35 lf concrete thickened edge (8"); 243 sf concrete slab (5") (reinf.); 10 ea street car tie removal. See outside link.
City of McCleary
Provide architectural and engineering professional services to prepare engineering (PE), right-of-way acquisition services, and construction engineering services for the South Third Street - Oak Street tot Simpson Avenue project includes roadway improvements, pedestrian facilities, drainage improvements, and utility relocations as necessary. Improvements include sidewalks, street lighting, street amenities (landscaping, signage, etc.), and stormwater management systems.
City of Carbondale
Replacement of 541 LF of sanitary sewer line and 5 manholes, also 3 inlets and mill and overlay of approx. 2,239 SY of Avenue and Street.
City of Bonney Lake
Replacement of approx. 203 LF of 8" PVC sewer main on 77th Street Court East, reconnecting of side sewers, water service replacement and hot mix asphalt surface restoration; as well as repairs of a damaged 8" PVC sewer main on 205th Avenue by replacing approx. 14 LF of the sewer main and reconnecting a 6" sewer side service.
Release
Oct 03, 2025
Close
Nov 07, 2025