Prince William County Service Authority
Construction of water storage tank (WST) rehabilitation and WST partial rehabilitation including mobilization/demobilization and close-out, including tank disinfection and hydraulic testing, existing conditions: clean up vegetation, perform site grading for overflow discharge, modify overflow pipe splash pad with curbing, protect existing equipment, modify sampling station drain discharge at floor drain, and rotate existing overflow pipe duckbill valve by 90 degrees, concrete: concrete and grout repair and recoating on interior and exterior tank base, miscellaneous metals, thermal and moisture protection, openings: repair person door and jam, provide surface preparation and coating, and replace lock set. Weather proofing doors, clean-up, and confirming door contacts are secure and aligned. See attached file.
Notice_to_Bidders
Release
Nov 25, 2024
Close
Dec 20, 2024