Kentucky Transportation Cabinet
Project consists of the removal and replacement of HVAC rooftop unit, two makeup air units, and multiple exhaust fans serving the kitchen and dining room. A boiler serving hydronic hot water to the kitchen rooftop unit and laundry space shall be replaced with two natural gas condensing boilers. Vavs shall be provided and ductwork modified in the ceiling cavity above dining room. Remove and replace ceilings and grid as required for duct modifications. Modify existing electrical circuits and breakers to accommodate new equipment. All work will be performed inside the facility perimeter security fence.
Final_RFB_785_2500000041_1_SO_FORM
Release
Jul 23, 2024
Close
Sep 13, 2024