Retrieving RFP details
Release
Close
Village of Homer
The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, services, connections, disconnections, insertion valves, and appurtenances for potable water. Installation will consist approx. 6,000 LF of 4"-8" PVC C900 for open-cut, approx. 680 LF OF 8" Ductile Iron for open-cut, and approx. 1,460 LF of 4"-12" PVC C900 Certa-Lok Yelomine Restrained Joint for horizontal directional bore water main along the design routes. There will be directional bores that cross State Highway Illinois Route 49, along with service connections to be directionally bored. There will be two jack and bore locations to cross the Norfolk Southern Railroad right of way. There will be one parallel occupancy location within Norfolk Southern Railroad right of way. This work also includes surface restoration with various pavements, curbing, and sidewalks.
City of Naperville
Water main improvements.
City of Sanford
provide design and construction of improvements to the Main Water Treatment Plant.
City of Arlington
Construction contract for 16" water transmission main improvements.
Release
Oct 10, 2025
Close
Nov 25, 2025