Huntington Beach Union High School District
Renovate certain food services facilities and equipment in the serving and storage areas at several comprehensive high schools. The project services to be provide by the selected team include: Preparation of construction drawings and details based on existing schematic designs. Removal and disposal of existing equipment and utility connections. Procurement of the required new food service equipment. Installation of all required utility connections including electrical power, water, sewer, and network data need to service the new equipment.
FOOD SERVICES EQUIPMENT UPGRADES AND REPLACEMENT PROJECT
zip
Release
Aug 29, 2024
Close
Sep 20, 2024