Retrieving RFP details
Release
Close
Anchorage School District
Design-Build Phase III project will replace the steel heat lines with ppl piping. Replace or relocate sprinkler piping as needed, reroute gas piping, remove abandoned electrical conduit or replace conduits as necessary, remediate hazardous materials, mold as necessary, replace fire rated assemblies and utilidor access. The division 22, 23, and 26 specifications are for this current project and are the minimum requirements for the whs utilidor upgrades phase iii project.
DESIGN-BUILD - West High School Utilidor Upgrades Phase III
zip
Jacksonville Transportation Authority
Provide design-build services for ultimate urban circulator program phase II - skyway conversion and phase III - neighborhood extension project.
Virginia Department of Transportation
DESIGN/BUILD: Design and construction experience of highway facilities. widening of four to five lanes, adding a high occupancy tolled, part-time shoulder Express Lane, replacing the existing flyover ramp, bridge widening. The work includes all work required for project management, design and construction of the project.
Foothill Transit Zone
DESIGN-BUILD. Provide design-build services and work for the Electric Bus Charging Station Upgrades.
Release
Oct 02, 2025
Close
Oct 30, 2025