Retrieving RFP details
Release
Close
St. Johns County
Design-build: work includes ground storage tank.
St. Johns County
To provide DESIGN BUILD services through a lowest price technically acceptable proposal for the construction of (a.) one (1) Ground Storage Tank at the Northwest Water Reclamation Facility (NW WRF) and (b.) one (1) Ground Storage Tank at the Silverleaf Reclaimed Water (RCW) facility.
City of Waco
Provide ground storage tank improvements. The project generally consists of the furnishing of all materials, equipment, appurtenances, and incidentals as required to properly fabricate, construct, inspect and test the construction items required for the installation of a new 5.0 mg ground storage tank, new piping, valves, fittings and appurtenances to serve the new ground storage tank, and the repair of the existing 5.0 mg ground storage tank.
Village of Yates City
New 75,000 GAL ground storage water tank.
Release
Oct 02, 2025
Close
Nov 03, 2025