Logo

starbridge

Book a Demo
RFPs/Design and construction of the Big Ten Broadcast Control Center

Design and construction of the Big Ten Broadcast Control Center

University Of Washington Seattle Campus

Summary

The University of Washington is seeking qualified design-build teams to design and construct the Big Ten Broadcast Control Center. The project involves renovating a 7,200 SF space within the Hec Ed Arena to include control rooms, a production studio, a Technical Operation Center, and other related facilities. The project requires specialized construction activities, with a focus on acoustics, cooling systems, and compliance with the UW Green Building Standard. The selected team must have experience in integrated design-build project delivery, production studios, and event spaces, as well as proficiency in advanced cost-estimating and permitting strategies. The deadline for submission is September 6th, 2024.

Files

208557 A3 (RFQ) Request for Qualifications

pdf

Details

Release

Sep 23, 2024

Close

Oct 14, 2024

Contacts

Source

Get a Free RFP Download