Retrieving RFP details
Release
Close
City of Niles
This work shall include the furnishing of all labor, materials, equipment, tools, cost of insurance and bonds and other miscellaneous costs for the complete demolition of the residential structure. An asbestos survey conducted by Villa Environmental of Benton Harbor, MI (attached excerpt) indicates the presence of asbestos in the building, including in the roofing materials. As part of this project the Contractor will be required to remove the asbestos and the building addition with the collapsed roof as asbestos waste as it would be dangerous to sort through.
Demolition of a Residential Structure Including Asbestos Abatement (241 N State St
)
City of Bryan
Work includes demolition and re-construction of a residential structure.
Fayette County
Inspection, Asbestos Testing, Asbestos Abatement, and Demolition.
City of Stillwater
Project consists of the demolition of auxiliary structures adjacent to the original school building. The existing original school structure is to remain. The Work includes, Demolition of auditorium, classroom, and cafeteria buildings - to be phased as specified; Selective demolition of walkway canopies and concrete paving; Selective removal of trees and stumps; Rough grading. See outside link.
Release
Jul 28, 2025
Close
Nov 17, 2025