Retrieving RFP details
Release
Close
St. Johns County
Soliciting a quote from qualified suppliers to provide demolition and installation of new lift station.
Elsinore Valley Municipal Water District
Project include gravity sewer main and lift station demolition.
City of Dania Beach
Work includes lift station 4 mitigation. Demolition of the existing submersible lift station and associated components; Removal, salvage, abandonment, or dismantling of existing piping and equipment; Cleaning and return of all submersible pumps, control panels, and generator systems to the City. Construction and installation of a new submersible lift station, including a valve vault; Installation of a macerator assembly and flow meter vault; Installation of new force mains and gravity sewer lines (ductile iron and PVC); Installation of new 1-inch HDPE water service with RPZ and hose bib; Installation of a new control panel system, electrical service, and emergency generator system.
Lake Stevens Sewer District
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
Release
Oct 30, 2025
Close
Nov 14, 2025