Dallas Rural Public Water District
Work includes installation of a 4" RJ SDR-21 PVC water main (by directional boring and/or trenching). Work includes all taps, valving, directional boring or trenching (through rock), disinfection and testing.
Release
Jul 28, 2024
Close
Jul 23, 2024