Retrieving RFP details
Release
Close
North Carolina Department of Transportation
Work includes unclassified excavation, 0. 29 cy of borrow excavation, 0. 55 ton of aggregate base course, erosion control stone, 0. 90 ton of asphalt concrete base course, typ, permeable asphalt drainage course, type, concrete shoulders adjacent to > 11 pavement, 27 LF of generic paving item concrete valley gutter remove/replace. See attached file.
DB00615 Milling, Mill Patching, Widening, Resurfacing, and Shoulder Reconstruction of Various Secondary Routes in Pitt County
zip
North Carolina Department of Transportation
668 EA generic grading item hauling NCDOT supplies shoulder material, 627 ton incidental stone base, 24.94 SMI shoulder reconstruction, 1,025 SY incidental milling, 14,774 ton asphalt conc intermediate course type I19.0C, 12,207 ton asphalt conc. surface course type S9.5B, 200 LF wattle, 14.58 ACR seeding & mulching.
North Carolina Department of Transportation
784 ton incidental stone base; 27. 24 smi shoulder reconstruction; 4,814 ton aggregate shoulder borrow 63,544 sy milling asphalt pavement, ***" depth (1-1/2"); 16,108 sy milling asphalt pavement, ***" depth (4-1/2"); 7,950 sy incidental milling; 7,324 ton asphalt conc base course, type b25. 0c; 24,004 ton asphalt conc surface course, type s9. 5c; 2,104 ton asphalt conc surface course, type s9. 5c (leveling course); 2,062 ton asphalt binder for plant mix; 3,996 ton patching existing pavement.
North Carolina Department of Transportation
Lump sum ls mobilization; 18 sy removal of existing asphalt pavement; 174 ton incidental stone base; 6. 94 smi shoulder reconstruction; 898 ton aggregate shoulder borrow; 272,026 sy milling asphalt pavement, ***" depth (1-1/2"); 8,104 sy incidental milling; 25,137 ton asphalt conc surface course, type s9. 5c; 1,491 ton asphalt binder for plant mix; 169 ton patching existing pavement; 249 lf 2'-6" concrete curb & gutter; 102 sy 4" concrete sidewalk; 1 ea concrete curb ramps; 70 ea remove and replace concrete curb. See attached file for full scope.
Release
Oct 15, 2025
Close
Nov 12, 2025