Retrieving RFP details
Release
Close
Town of Hubbardton
Remove existing culvert on High Pond Road and replace with upsized culvert.
scan0065
Town of Shrewsbury
Replacement of existing 6 FT culvert with a new precast box culvert and wingwalls along the Cold Brook on Northam Road in Town of Shrewsbury, Vermont. Specifically, the work will include mobilization, traffic control, sediment and erosion control, excavation, control of water, removal of the existing culvert, installation of new precast culvert & wingwalls, full depth roadway reconstruction, asphalt paving, pavement markings, guardrail, restoration and related roadway and channel work in accordance with the contract plans and specifications.
Walton County
Provide culvert replacement.
Township of Perry
Work includes approx 1 Ls demolition; 1 LS culvert; 1 Ls storm sewer piping, inlet and endwall; 400 SY bituminous pavement replacement.
Indiana Department of Administration
Potato creek state park culvert replacement project and not exceed 9mb.
Release
Oct 16, 2025
Close
Oct 31, 2025