City of Fayetteville
Consulting engineer to evaluate both liquid and solids handling facilities and equipment at the Facility. The selected consultant will prepare a Preliminary Engineering Report (PER) summarizing their findings and outlining recommended upgrades and rehabilitation projects, not associated with treatment expansion, but critical for maintaining operational reliability.
PWC2425019-Cross-Creek-Water-Reclamation-Facility-Reliablity-Study-002
Release
Aug 12, 2024
Close
Sep 27, 2024