Logo

starbridge

Book a Demo
RFPs/Crooked Pond Water Treatment Plant Air Stripping Tower and Carbon Contactor Media Replacement

Crooked Pond Water Treatment Plant Air Stripping Tower and Carbon Contactor Media Replacement

Town of Falmouth

Summary

The Work of the Base Bid consists of the replacement of media in the existing air stripper tower at the Crooked Pond Water Treatment Plant including removal and disposal of the existing media, cleaning the tower and the Wetwell Tank below the air tower, and the furnishing and installation of new media. Granular Activated Carbon (GAC) media replacement for two existing carbon contactors shall be included in the Contract if the Owner proceeds with an Additive Alternate A based on the availability of funds and the proposed pricing in the Form For General Bid. Additive Alternate A will consist of the removal and disposal of existing carbon media in each of the two existing carbon contactors, cleaning the carbon contactors and a Backwash Recycle Tank, and the furnishing and installation of new GAC media.

Files

Advertisement

pdf

Details

Release

Feb 07, 2025

Close

Feb 27, 2025

Contacts

Source