Town of Falmouth
The Work of the Base Bid consists of the replacement of media in the existing air stripper tower at the Crooked Pond Water Treatment Plant including removal and disposal of the existing media, cleaning the tower and the Wetwell Tank below the air tower, and the furnishing and installation of new media. Granular Activated Carbon (GAC) media replacement for two existing carbon contactors shall be included in the Contract if the Owner proceeds with an Additive Alternate A based on the availability of funds and the proposed pricing in the Form For General Bid. Additive Alternate A will consist of the removal and disposal of existing carbon media in each of the two existing carbon contactors, cleaning the carbon contactors and a Backwash Recycle Tank, and the furnishing and installation of new GAC media.
Advertisement
Release
Feb 07, 2025
Close
Feb 27, 2025