Dept of the Army, US Army Corps of Engineers, CESWT- CT
This project is to repair deteriorated asphalt pavement to the Crest Roadway and Overlook Area as well as replace the roadway striping and parking striping of the Overlook Area. The existing Crest Roadway has a Centerline length of ~6, 900 LF. The majority of the roadway is 26 ft wide equating to ~12,820 SY of asphalt pavement. The Overlook Area is ~1,260 SY of asphalt pavement.
Release
Aug 21, 2024
Close
Sep 21, 2024