Fargo Park District
Replacement of ice plant chiller equipment.
Ohio University Main Campus
Work includes bird arena ice rink floor replacement.
Massachusetts Convention Center Authority
Work includes replacement of the massmutual center ice plant, which is approx 22 years old and is approaching the end of its useful life. The existing system utilizes r-22 refrigerant, which has since been banned from domestic production or foreign import due to the clean air act and has experienced unpredictable price fluctuations along with its very high global warming and ozone depletion impact. A new refrigerant, co2, has been selected for use to be used by the new packaged chiller skid equipment as part of this new work.
Township of East Brunswick
Operation of the food and beverage concession at the ice arena.
Release
Oct 22, 2025
Close
Nov 13, 2025