Ohio University Main Campus
Remove and replace controllers and actuators on existing fan powered (with reheat coils) and cooling only VAV air terminal boxes. Remove and protect existing ceiling for re-installation. Disconnect and remove 277 v wiring from fan powered VAV boxes. Remove and replace VAD for air handling unit ahu-1, ahu-2 and relief fan raf-1.
Bid ad
Release
Jun 01, 2024
Close
Oct 17, 2024