Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Suny Buffalo State College
Provide cooling tower water treatment & sampling services.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Air Mobility Command
HVAC cooling tower chemical sampling and treatment. Cooling tower, closed loop, and coupon rack systems water/chemical monitoring, sampling and treatment for the Heating, Ventilation and Air Conditioning (HVAC) equipment located at various facilities.
Posted Date
Aug 25, 2025
Due Date
Dec 11, 2025
Release: Aug 25, 2025
Air Mobility Command
Close: Dec 11, 2025
HVAC cooling tower chemical sampling and treatment. Cooling tower, closed loop, and coupon rack systems water/chemical monitoring, sampling and treatment for the Heating, Ventilation and Air Conditioning (HVAC) equipment located at various facilities.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Veterans Affairs
Work includes the removal and replacement of adva's existing cooling tower.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Alabama Department of Veterans Affairs
Close: Dec 18, 2025
Work includes the removal and replacement of adva's existing cooling tower.
AvailableWilmette Park District
The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Wilmette Park District
Close: Dec 19, 2025
The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
AvailableUniversity Of California Santa Cruz
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
Posted Date
-
Due Date
Dec 3, 2025
Release: -
University Of California Santa Cruz
Close: Dec 3, 2025
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →