Construction Services for To Howard Coffin Well Casing

Brunswick-Glynn Joint Water and Sewer Commission

Summary

Video inspection of the well has determined that the casing needs repair by installing a 40-foot section of 16-inch liner inside of the casing to an approximate depth of 580 ft. The work components for this repair include brine kill for flow suppression to perform the repairs, joint welding of the casing, cement grouting, pumping equipment and material to fill annulus space, brine plug removal, installation of existing turbine pump and a well pump.

Files

No files

Details

Release

Nov 01, 2024

Close

Dec 05, 2024