Retrieving RFP details
Release
Close
El Paso County
Installation of new concrete trail, curb & gutter, underground drainage pipes, guardrails, fences, retaining walls and asphalt patching associated with existing roadways.
County of Placer
Parkway phase 1 - construction project.
Tabby Valley Parks & Recreation Special Service District
Construction of phase 1 and phase 2 of trail. The project includes the installation of a 6' wide asphalt or concrete pedestrian walking trail approximately 1 mile long.
City of Dallas
Construction of 12 FT wide concrete trail. Work includes approx. 1 LS mobilization, 261 EA tree removal, 70 STA clearing & grubbing, 370 LF F&I 24" class III RCP, 20,900 CY excavation, 20 CY 6" concrete riprap, 13 EA bollard, 420 LF 6' chain link fence, 3,560 LF 4" solid white pavement marking, 4 EA bicycle hill sign, 5,700 SF soil nail retaining wall, 91 CY pedestrian bridge abutment, 615 LF pedestrian railing, 12 MO plant maintenance, 29 EA LED solar underpass luminaire, 74 LF 1-1/2" PVC sch 40 conduit, 74 LF trenching.
Release
Oct 21, 2025
Close
Nov 19, 2025