Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Granby
The Town of Granby seeks bids for the design and construction of a steel garage at Salmon Brook Park. The project includes site preparation, concrete work, and installation of a 24' X 24' X 10' gable style clear span steel building with specific features such as a 9' X 9' garage door and a single walk-in steel door. Contractors must provide certified steel drawings and meet specific insurance requirements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Granby
The Town of Granby seeks bids for the design and construction of a steel garage at Salmon Brook Park. The project includes site preparation, concrete work, and installation of a 24' X 24' X 10' gable style clear span steel building with specific features such as a 9' X 9' garage door and a single walk-in steel door. Contractors must provide certified steel drawings and meet specific insurance requirements.
Posted Date
-
Due Date
Dec 5, 2025
Town of Granby
Close: Dec 5, 2025
The Town of Granby seeks bids for the design and construction of a steel garage at Salmon Brook Park. The project includes site preparation, concrete work, and installation of a 24' X 24' X 10' gable style clear span steel building with specific features such as a 9' X 9' garage door and a single walk-in steel door. Contractors must provide certified steel drawings and meet specific insurance requirements.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Doral
Provide pre construction and construction management at risk services for the central park parking garage and recreation area.
Posted Date
Nov 24, 2025
Due Date
Dec 23, 2025
Release: Nov 24, 2025
City of Doral
Close: Dec 23, 2025
Provide pre construction and construction management at risk services for the central park parking garage and recreation area.
AvailableCity of Bloomington
Steel supply.
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
City of Bloomington
Close: Dec 2, 2025
Steel supply.
AvailableWashington Suburban Sanitary Commission (WSSC)
Owner is seeking to establish a time and materials contract for the construction of a Garage. The new construction will consist of a jet truck garage housing six (6) CCTV/jet trucks, outdoor receptacles adjacent to the garage for three (3) CCTV trucks, and a parking area for three (3) CCTV/jet trucks. The garage will keep the trucks with temperatures above 50 degrees Fahrenheit during the winter months and will avoid any future issue on the trucks. Temple Hills Jet Truck Garage Construction. Project work includes: 1. New pre-engineered metal building structure and enclosure. The building is approx 5,500 SF (one story) to accommodate six truck bays. 2. New concrete foundations and slab-on-grade for the pre-engineered building. 3. New doors, frames, and hardware. 4. New fire extinguishers and bollards. 5. New HVAC equipment, unit heaters, exhaust fans, and air louvers with dampers. 6. New indoor light fixtures, exit signs, outdoor wall packs and pole light. 7. New transformer, electrical panels, conduit from main building, wiring, and services. 8. Three new outdoor parking spaces with receptacles for CCTV trucks. 9. Sitework, including utilities, grading, paving, stormwater management, and landscaping.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Washington Suburban Sanitary Commission (WSSC)
Close: Dec 18, 2025
Owner is seeking to establish a time and materials contract for the construction of a Garage. The new construction will consist of a jet truck garage housing six (6) CCTV/jet trucks, outdoor receptacles adjacent to the garage for three (3) CCTV trucks, and a parking area for three (3) CCTV/jet trucks. The garage will keep the trucks with temperatures above 50 degrees Fahrenheit during the winter months and will avoid any future issue on the trucks. Temple Hills Jet Truck Garage Construction. Project work includes: 1. New pre-engineered metal building structure and enclosure. The building is approx 5,500 SF (one story) to accommodate six truck bays. 2. New concrete foundations and slab-on-grade for the pre-engineered building. 3. New doors, frames, and hardware. 4. New fire extinguishers and bollards. 5. New HVAC equipment, unit heaters, exhaust fans, and air louvers with dampers. 6. New indoor light fixtures, exit signs, outdoor wall packs and pole light. 7. New transformer, electrical panels, conduit from main building, wiring, and services. 8. Three new outdoor parking spaces with receptacles for CCTV trucks. 9. Sitework, including utilities, grading, paving, stormwater management, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →