Brownsville Public Utilities Board
Work includes construct the substation and control building. Includes 3 AFDE - 138kV A-frame deadend structure (approx wt. EA. 26,911 lbs.); 10 HLB1 - 138kV single-phase low bus structure (approx wt. EA. 366 lbs.); 11 OP - operator platform (approx wt. EA. 270 lbs.); 3 138kV large angle dead-end; 1 lot of 12.47kV bus work associated with transformer #1 & #2, conductors, jumpers, bus supports, insulators, bus clamps, connectors, fittings, connector bolts, and miscellaneous hardware; see attached file.
B06424-Re-Bid-Construction-of-Airport-Substation-and-Control-Building-Final
Release
Jul 02, 2024
Close
Sep 18, 2024