Retrieving RFP details
Release
Close
Rochester Public Schools Independent School District 535
Construction of a pitless booster station to increase the water pressure.
Cape Fear Public Utility Authority
Project consists of construction of a new booster pump station with piping, pumps, building, electrical, etc. As well as a new transmission pipeline to tie into the existing system.
City of Peoria
The City of Peoria, AZ seeks a design consultant to provide design and construction administration services for equipment and infrastructure improvements at the Agua Fria Booster Station (B302). The project will expand booster station capacity to better serve the City’s northern and western water distribution systems and includes preparing design documents and support through construction.
Chester Water Authority
Upgrade of potable water booster pumps, valves, controls, generator, interior piping, building improvements as well as site improvements to an existing booster pump station. Includes bypass pumping during the project.
Release
Nov 02, 2025
Close
Nov 21, 2025