Retrieving RFP details
Release
Close
Covington County
The work consist of approx 28 CY unclassified excavation; .617 MI 4" wide thermoplastic edge stripe; 3,256 LF 4" wide thermoplastic traffic stripe; 1 EA reflectorized traffic warning sign; 2 EA reflectorized traffic object marker.
156-20251014111923 BSCC-1
Mississippi Department of Transportation
Work includes : 28 CY unclassified excavation (fm); 3 TN hot mix asphalt, st, 12.5 mm (edge repair); 55 TN hot mix asphalt, st, 19 mm (base repair); 438 TN hot mix asphalt, st, 9.5 mm, overlay; 3,256 LF 4" wide thermoplastic traffic stripe (continuous yellow) ( 90 mil); see attached file.
Lee County
Construction of 0. 121 miles of bridge & approaches on county road 185 being known as local system bridge program (LSBP).
Lauderdale County
1. 000 ls, mobilization; 152. 000 cy, unclassified excavation (fm); 826. 000 cy, crushed stone (size 610) (lvm); 4,661. 000 ton asphalt, st, 12. 5mm; 4,866. 000 ton asphalt, st, 19mm ; 300. 000 ton, asphalt, st, 12. 5mm, base repair ; 100. 000 ton, asphalt, st, 12. 5mm, edge repair ; 3,352. 000 ton, asphalt, st, 12. 5mm, leveling ; SEE ATTACHED FILE FOR FULL SCOPE.
Release
Oct 21, 2025
Close
Dec 01, 2025