Harris County Municipal Utility District 165
The site work contractor is responsible for all work, including but not limited to construction of wood fencing and wood dual swing gates; a twelve-foot (12') diameter concrete lift station wet well complete with three (3) submersible pumps with all accessories, riser piping, valves, coatings and supports; yard piping, influent piping; effluent piping and outfall; manholes; site work; storm piping and outfall; crushed concrete roads and IWTP pad; protective coatings; concrete pads; swales, culverts, and inlets; and crushed concrete walkways. The electrical scope of the site work shall include new utility electrical service; diesel generator with surrounding sidewalk and automatic transfer switch; service rack; surge protection devices; installation of PLC supplied by package plant vendor; lift station control panel; lift station terminal boxes; terminal box at Digester No. 2; wires and conduits from the terminal box at Digester No. 2 to the electrical rack; site lighting, autodialer, and all duct banks, conduit and wire up to the proposed local control panels including all aboveground conduits and wire to pads and all else specified and shown in the construction drawings .
Construction of 0
1 MGD WWTP
Release
Jan 11, 2025
Close
Feb 06, 2025