Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Boulder City
The City of Boulder City is soliciting a Construction Manager at Risk to provide pre-construction and construction services for a new Air Traffic Control Tower at Boulder City Municipal Airport. The work includes an approximately 126-foot tower with a 500 sq ft control cab, an adjoining 2,400 sq ft base building, utility extensions, parking, and related site work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Boulder City
The City of Boulder City is soliciting a Construction Manager at Risk to provide pre-construction and construction services for a new Air Traffic Control Tower at Boulder City Municipal Airport. The work includes an approximately 126-foot tower with a 500 sq ft control cab, an adjoining 2,400 sq ft base building, utility extensions, parking, and related site work.
Posted Date
-
Due Date
Jan 5, 2026
City of Boulder City
Close: Jan 5, 2026
The City of Boulder City is soliciting a Construction Manager at Risk to provide pre-construction and construction services for a new Air Traffic Control Tower at Boulder City Municipal Airport. The work includes an approximately 126-foot tower with a 500 sq ft control cab, an adjoining 2,400 sq ft base building, utility extensions, parking, and related site work.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Victoria Regional Airport
Project includes work required to preform rehabilitation for the Air Traffic Control Tower building at Victoria Regional Airport. Work includes but is not limited to: Non-structural demolition (ceiling tiles, hvac items, plumbing items, casework), roofing items, carpentry and cabinet items, door upgrades, window glazing improvements, drywall, tiling, accoustic ceilings, flooring, paint and coatings, restroom amenities, kitchette amenities, elevator rehab, plumbing improvements, hvac improvements, electrial improvements, and security improvements.
Posted Date
Nov 15, 2025
Due Date
Dec 2, 2025
Release: Nov 15, 2025
Victoria Regional Airport
Close: Dec 2, 2025
Project includes work required to preform rehabilitation for the Air Traffic Control Tower building at Victoria Regional Airport. Work includes but is not limited to: Non-structural demolition (ceiling tiles, hvac items, plumbing items, casework), roofing items, carpentry and cabinet items, door upgrades, window glazing improvements, drywall, tiling, accoustic ceilings, flooring, paint and coatings, restroom amenities, kitchette amenities, elevator rehab, plumbing improvements, hvac improvements, electrial improvements, and security improvements.
Lake Apopka Natural Gas District
Construction manager at risk.
Posted Date
Nov 3, 2025
Due Date
Jan 16, 2026
Release: Nov 3, 2025
Lake Apopka Natural Gas District
Close: Jan 16, 2026
Construction manager at risk.
AvailableRowan University
Construction manager at risk for college.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Rowan University
Close: Jan 6, 2026
Construction manager at risk for college.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →