Retrieving RFP details
Release
Close
Alabama Department of Transportation
Constructing the planing, resurfacing, guardrail installation, and traffic stripe. Includes 13 EA of removing guardrail end anchor (all type); 7,747 gal. of tack coat; 77,465 Sy of planing existing pavement (approx 0.00" thru 1.0" thick); see attached file.
NTC 11
07
Alabama Department of Transportation
Work includes constructing the planing, resurfacing, bridge rail retrofit, guardrail installation and traffic stripe. Includes 16 SY of removing concrete flumes; 84 CY of unclassified excavation; 18 CY of cement mortar flowable backfill, mix 2; 1,589 TN of crushed aggregate, section 825, for miscellaneous use; 189 LF of 24" roadway pipe, jacked installation (smooth steel); 5,700 LF of combined duct and cable,2 #6 AWG/ 1 #6 AWG ground; see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, guardrail installation, and traffic stripe. Includes 813 LF of removing guardrail; 12,918 gal. of tack coat; 129,154 SY of micro-milling existing pavement (approx. 1.10" thru 2.00" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing (scrub seal), guardrail installation, and traffic stripe. Also includes 291 LF of removing guardrail;36,210 SY of bituminous treatment G (with polymer additive); 10,993 gal. of tack coat; 99,930 SY of micro-milling existing pavement (approx. 1. 10" thru 2.00" thick); see attached file.
Release
Oct 10, 2025
Close
Nov 07, 2025