Retrieving RFP details
Release
Close
Jackson County
Work includes 1 LS of mobilization; 1 LS of clearing and grubbing; 1 LS of removal of obstructions; 2,500 SY of removal of asphalt (all depth); 40 SY of removal of concrete (all depth); 2,502 CY of unclassified excavation (FM); 5,527 CY of excess excavation; 2,459 SY of geogrid, type iii; 1,030 TN of crushed stone (size 610); 10 LF of 18" corrugated polyethylene pipe; 162 LF of guard rail, bridge end section, type "i" thrie beam; 10 EA of right-of-way markers (type ii); 1,529 SY of solid sodding; 684 CY of topsoil for slope treatment (contractor finished; etc, see outside link.
Monroe County
Taylor Road Bridge Replacement Project.
Cole County
Work includes removals, clearing and grubbing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding and mulching, erosion control and other miscellaneous work necessary to remove and replace the bridge road bridge. Also includes 3,920 SY of 6" depth subgrade compaction; 125 SY of bridge approach slab (minor); 958 LF of MGS guardrail; 1,486 LF of permanent fence; see attached file.
Wood County
Provide Replacement of Bowling Green Road West Bridge.
Release
Oct 12, 2025
Close
Nov 12, 2025